Monday, 14 October 2013
Tuesday, 8 October 2013
Monday, 7 October 2013
production schedule
Production Schedule
Production
Company: Connect Date:
27.09.13
Director:
Hajra
Siddiqui
Crew:
Sevil,
Jasmine, Amira and Hajra
Pre-Production:
Pre-production
|
Details of Activity
|
Date
|
The Pitch
|
We are going to discuss ideas for a short
film and then create a synopsis for the short film
|
Friday 13th September
|
Proposal
|
The proposal includes the synopsis, the
target audience and the purpose of our short film.
|
Friday 20th September
|
Treatment
|
We are going to write up what is going to
be in the short movie, this will include: shots, Mise-en-scene and lighting
|
Friday 20th September
|
Audience Profile
|
Includes two people from our target
audience that will watch the film.
|
Friday 20th September
|
Resources for Mise-en-scene
|
The Mise-en-scene includes the location of
the filming, the props we will use, the costumes, hair and makeup and
lighting.
|
Friday 20th September
|
Textual Analysis
|
We are going to watch a movie similar to
our short movie and contrast and compare the two
|
Friday 27th September
|
Screenplay
|
The script we have made will be the dialogue
in our film which we will read when filming
|
Friday 27th September
|
Shot List
|
We have made a shot list which will show us
the particular shots we will be shooting
|
Friday 27th September
|
Recce Report
|
The recce report will show a detailed
description of the location where we are shooting with pictures
|
Friday 4th October
|
Production:
Filming Days
|
Details of Activity
|
Date
|
First filming day
|
we will film from shot 1-40 on our first
filming day
|
Friday 11th October
|
second filming day
|
We will film from shot 41-83 on our second
filming day
|
Monday 14th October
|
Post-Production:
Post-Production
|
Details of Activity
|
Date
|
Rough Cut
|
Finished filming and editing for the first
rough cut
|
21/10/13 – 25/10/13
|
Second Cut
|
Finished filming and editing for the second
rough cut
|
19/11/13 – 3/11/13
|
Final Cut Deadline
|
the filming and editing for the final cut
|
25/11/13 – 07/12/13
|
Subscribe to:
Posts (Atom)