Monday, 7 October 2013

production schedule


Production Schedule

Production Company: Connect                                                Date: 27.09.13

Director: Hajra Siddiqui                                                           

Crew: Sevil, Jasmine, Amira and Hajra


Pre-Production:

Pre-production
Details of Activity
Date
The Pitch
We are going to discuss ideas for a short film and then create a synopsis for the short film
Friday 13th September
Proposal
The proposal includes the synopsis, the target audience and the purpose of our short film.
Friday 20th September
Treatment
We are going to write up what is going to be in the short movie, this will include: shots, Mise-en-scene and lighting
Friday 20th September
Audience Profile
Includes two people from our target audience that will watch the film.
Friday 20th September
Resources for Mise-en-scene
The Mise-en-scene includes the location of the filming, the props we will use, the costumes, hair and makeup and lighting.
Friday 20th September
Textual Analysis
We are going to watch a movie similar to our short movie and contrast and compare the two
Friday 27th September
Screenplay
The script we have made will be the dialogue in our film which we will read when filming
Friday 27th September
Shot List
We have made a shot list which will show us the particular shots we will be shooting
Friday 27th September
Recce Report
The recce report will show a detailed description of the location where we are shooting with pictures
Friday 4th October

                                                                                                                       

Production:

Filming Days
Details of Activity
Date
First filming day
we will film from shot 1-40 on our first filming day
Friday 11th October
second filming day
We will film from shot 41-83 on our second filming day
Monday 14th October

                                                                                                                       

Post-Production:

Post-Production
Details of Activity
Date
Rough Cut
Finished filming and editing for the first rough cut
21/10/13 – 25/10/13
Second Cut
Finished filming and editing for the second rough cut
19/11/13 – 3/11/13
Final Cut Deadline
the filming and editing for the final cut
25/11/13 – 07/12/13